Room Integrity Testing

  • integrity-testingTo ensure the effectiveness of your gaseous fire suppression system, the ‘integrity’ of the room, i.e. its capacity to HOLD the gas is a critical factor in achieving a ‘Pass’ to NFPA 2001 Strandards.
  • Room Integrity Testing is vital to ensure your protected area is well-sealed and your gaseous agent won’t escape causing the fire to possibly re-ignite
  • Integrity Testing is a mandatory requirement of BS ISO 14520 and should be undertaken annually
  • Integrity testing should also be carried out every time building work is undertaken in or around the protected area

Testing is required each year to re-certify the room and the gas suppression performance, and may be a requirement of the Clients Insurance Company to revalidate the protection provided to the space.

Draper Ltd Fire carry out such Room Integrity testing and can offer a remedial sealing and retesting service.

To book a door fan pressure test or to discuss your requirements in more detail contact at : enquiries@draperfire.co.uk

Unit 4 Dockray Hall Mill, Kendal, Cumbria, LA9 4RU

© 2017 Draper Limited | Sitemap